Willinga Park,
Bawley Point NSW
Complete Civil, Mechanical and Acoustics package installation including Intake & Discharge attenuation, Fuel and Oil Bulk storage tanks, Day tanks, Pumps and supply/return lines
Engine Exhaust, Acoustics, Fuel System

Bunyip Football Club,
Bunyip VIC
Complete Domestic Hot Water Package including Factory assembly of Skid Mounted Storage Tanks, On-Site de-commissioning and removal of old Heat Pump style Hot Water Units, On-Site installation and commissioning of New Revere Heat Pump units.
Heat Pump Hot Water Revere

Bourke Street,
Melbourne CBD VIC
Renewal of Heating Water System including De-commissioning and Removal of existing old RayPak Boilers, Shutdown and Modification of Existing Pumps and Pipework, On-Site assembly of new Ideal Condensing Boilers. Gas, Electrical and all Hydraulic connections to existing building infrastructure.

Gladstone Street,
Moonee Ponds VIC
Complete Mechanical and Acoustics installation including Bulk Fuel Tank, Fill point and Fuel Lines, Remote radiator package, discharge exhaust, remote air inlet fan and plenum, fire dampers and acoustic attenuation package.

Windrock Ave,
Craigieburn VIC
Renewal of Heating Water System including De-commissioning and Removal of existing old RayPak Boiler, Shutdown and Modification of Existing Pumps and Pipework, On-Site assembly of new Meridian Condensing Boilers. Gas, Electrical and all Hydraulic connections to existing building infrastructure.

Collins Street,
Melbourne CBD VIC
Renewal of Heating Water System including De-commissioning and Removal of existing old RayPak Boilers, Shutdown and Modification of Existing Pumps and Pipework, On-Site assembly of new Ideal Condensing Boilers. Gas, Electrical and all Hydraulic connections to existing building infrastructure.

Myer Place,
Rowville VIC
Off-site Pre-Fabrication of Skid Mounted 1000lt Storage Tanks & Condensing Boilers.
On-Site Installation, Connections and Commissioning for a new Tenancy Fit-out.

Robertson Street,
Kensington VIC
Renewal of Heating Water System including Staged de-commissioning and removal of existing old RayPak Boilers and replacement with 3x Arizona Boilers, New HHW 2000lt Storage Tanks, Ring Main, Plate Heat Exchangers, Circulating pumps & the first SHARC Waste-water Heat Recovery System to be Installed & Commissioned in Australia.